23 Cavendish Close – London

Consultant: The KUT Partnership
Main Contractor: B&G Construction

The Project

Cavendish close located in St Johns wood underwent a transformation having a 2 floor basement installed at the front and the rear of the property, and then joined under the main building. The 230m deep bore holes were drilled prior to the digging out of the basements

The cooling and heating load for the residence 80kW was achieved by a closed loop system The ground source heat pumps simultaneous heating and cooling is obtained using 2 Mitsubishi VRF Simultaneous heating and cooling heat pumps coupled with Fan coils and a Mitsubishi AG200 centralized controller achieving an overall COP of 4.9

The total project duration was 24mths